Data centers, built people first.

Every job tracked for climate, safety and integrity, every day. Open to your owner, clear to your neighbors, and handed over reporting-ready.

Most data center firms show you the building.
We show you the people building it,
and the ground it stands on.

That's the Northstar System. Three points we steer every job by, tracked daily and shared openly: climate, safety and integrity.

Your photo: the land, water and sky around the site

Climate

Know what it costs the land.

Carbon in the concrete and steel. Water drawn on site. Fuel burned. Power switched on. Tracked against targets, so the answers are ready before the questions come.

  • Carbon in materials
  • Water and fuel used on site
  • Power energized, hall by hall
Your photo: a crew in safety gear at first light

Safety

Everyone goes home.

The first number on every Northstar dashboard is the one that matters most: the people on site, and whether they're safe.

  • Days without an incident
  • Near misses reported, not hidden
  • Safety talks held, crew on site
Your photo: an engineer testing equipment, hands on the work

Integrity

Every number has proof.

Each figure ties back to a ticket, a meter or a signed test. Owners see it, inspectors trust it, and nobody has to take our word for it.

  • Five levels of testing, piece by piece
  • Inspections passed
  • Records with proof attached

Try the Northstar dashboard.

Switch jobs, change the time frame, or flip to what neighbors would see. Example data only.

Example job: 96 megawatt campus
Today, updated 4:52 PM

Climate

36 MW
of 96 megawatts energized
Carbon in materials62 of 70 tons
Water used38,000 gal
Fuel burned1,840 gal

Safety

147
days without an incident
Crew on site412
Near misses reported3
Safety talks held6

Integrity

97%
of records have proof attached
Inspections passed38 of 40
Testing, levels 1 to 5Level 5 not started
L1
L2
L3
L4
L5

Example data for illustration. In a real build, every number links to its proof: delivery tickets, meter readings and signed tests.

Owner report

Example job: 96 megawatt campus, today
Carbon in materials62 of 70 tons
Water used38,000 gal
Fuel burned1,840 gal
Power energized36 of 96 MW
Days without an incident147
Crew on site412
Near misses reported3
Inspections passed38 of 40
Records with proof attached97%
Testing at level 50%

In a real build, this report exports as a PDF with every proof document attached, on the schedule your owner sets.

Ready before anyone asks.

States and Congress are weighing new reporting rules for data center energy and water use. With Center House, the records start on the first day of construction and pass to the owner at handoff. Whatever gets asked, the answers already exist.

  1. GroundbreakClimate, safety and testing tracking starts on day one.
  2. Every day on siteNumbers tied to tickets, meters and signed tests.
  3. Power onEach hall's energizing dated and recorded.
  4. HandoffThe owner receives the full record, and owns it.

Who we work with.

Trade contractors

Electrical, mechanical and concrete crews on data center jobs, who need clean records their general contractor will accept.

General contractors

One view across trades, equipment and testing, without stitching reports together by hand.

Owners and developers

Climate, safety and progress numbers you can stand behind with your board and your neighbors.

Now taking our first data center projects.

Every build starts with a conversation about your job, your systems and the questions you're being asked. Let's start there.

Start a conversation